Speed, voltage and frequency are linked
For a synchronous machine, electrical frequency follows rotational speed and pole count. If a project requires fixed grid frequency while the prime mover operates over a variable speed range, power electronics usually decouple generator frequency from grid frequency. NREL describes full-converter wind turbine models in which the converter handles the generator output and controls the grid interface. The converter architecture is therefore a core selection input, not an accessory chosen at the end.
State whether the desired output is variable-frequency AC, regulated AC, rectified DC or a DC link feeding an inverter. Include voltage range, current, power factor or DC-load behavior and fault expectations. For battery charging or isolated loads, describe the downstream regulation and protection. This prevents a winding optimized for one interface from being proposed for a different electrical system.
Torque and structural loads matter
Generator torque follows power divided by angular speed, so lower-speed machines can require substantial torque and larger structural interfaces. The shaft, rotor, bearings, housing, base and coupling must withstand steady torque, transient events and overspeed. In direct-drive wind or hydro arrangements, the generator may also interact with large external bearings or flexible structures.
Provide the mounting concept, shaft and coupling drawing, external radial and axial loads, allowable mass and envelope, vibration environment and balancing requirement. Identify which party supplies bearings and structural supports. A generator that meets electrical output requirements can still be unusable if the mechanical interface or rotor dynamics are not compatible with the prime mover.

Thermal design follows the duty profile
Copper, core, magnet, bearing and power-electronic temperatures influence generator capability and life. Cooling may rely on natural air, forced air, liquid or another project-specific arrangement. The correct choice depends on loss distribution, enclosure, ambient conditions, altitude, contamination and available auxiliary power. Intermittent peaks and sustained part-load operation should be included in the thermal cycle.
Share ambient temperature range, humidity, dust, salt exposure and whether the generator operates indoors, outdoors or offshore. State cooling-fluid conditions when liquid cooling is considered. Temperature sensors and protection logic should be planned with the machine and converter. A rated output should always be read with its cooling and environmental conditions.
Cogging, starting and low-speed behavior
Permanent magnet machines can exhibit cogging torque due to the interaction between rotor magnets and stator slotting. NREL research on advanced PM generator topologies identifies cogging torque as a design concern because it can affect self-start behavior, noise and performance in small wind systems. The importance of cogging depends on the prime mover, inertia, starting torque and control architecture.
If self-starting at low input torque matters, provide the prime-mover torque-speed curve and minimum useful speed. If the generator is driven by an engine or controlled turbine with ample starting torque, priorities may differ. Describe permissible torque ripple, noise and vibration so these factors can be evaluated against the actual application rather than treated as universal pass-fail labels.
Converter and protection coordination
The generator and converter must agree on voltage range, current, switching, insulation stress, short-circuit response, DC-link control and braking or dump-load strategy. Define what happens during load rejection, grid faults, overspeed or converter shutdown. The system needs a safe path for mechanical input energy when electrical power cannot be delivered normally.
Protection may include temperature, overspeed, overcurrent, overvoltage, vibration and cooling supervision. The exact list depends on the system hazard analysis. Clarify whether protection resides in the generator sensors, converter, turbine controller or plant control system. Assigning these functions early avoids gaps and duplicate assumptions during commissioning.

PMG request-for-quotation package
Provide rated and maximum power, nominal and full speed range, continuous and transient torque, desired voltage and phase arrangement, frequency or DC-link requirement, converter details, load type, duty cycle, cooling, environment, overspeed, mounting, shaft and coupling information, allowable envelope and required sensors. Add the prime-mover curve where available.
Mark which values are fixed and which can be optimized. If the project is at concept stage, state the uncertainty range rather than inventing a precise point. ENNENG can then identify feasible directions and the calculations or tests needed next. This creates a technical record that can support design review, quotation and later acceptance planning.